Empennage
Horizontal Stabilizer
- 6.1.1 – 5 Horizontal Stabilizer: Rear Spar Assembly 15 Jun 152.75
- 6.1.6 – 8 Prep rear hinge brackets 17 Jun 150.9
- 6.1.9 – 11 Assemble rear brackets 20 Jun 150.5
Vertical Stabilizer
Rudder
Elevators
Wings
Main Structure
- 7.8.4 & 5 Debur & dimple left wing structure 15 Oct 175.0
- 7.7.46 & 8.5 Another water test and some wing work 16 Oct 172.0
- 7.8.4, 5 & 11 Deburred and dimpled right wing structure and riveted le… 21 Oct 176.0
- 7.1.8 Torque tie down brackets to 25″ lbs. 10 Nov 170.5
- 7.7.58 Leak test left tank (again), rivet spar & deblue skins 15 Nov 172.0
- 7.8.2 & 8 Scarfed the wing joint corner and prepped inboard skins for … 02 Dec 17
- 7.8.2 Prepping the top wing skins for priming 07 Dec 176.75
- 7.8.2 Priming top wing skins 08 Dec 174.5
- 7.8.8 & 21 Cleco top skins and prep aileron gap fairing 10 Dec 17
- 7.8.15 Riveted top skins 16 Dec 17
- Preparing the pitot mast 21 Dec 17
- Fitted pitot controller and Autopilot servo 22 Dec 17
- 7.8.2 & 19 Prep bottom skins and flap brace 27 Dec 17
- 7.8.2 Debur left outboard skin & fabricate pitot bracket 01 Jan 18
- 7.8.2 Debur right outboard skin and dimple both left & right skins 05 Jan 18
- 7.8.2 Scarf inboard right skin, drill flap brace & clean left parts fo… 06 Jan 18
- 7.8.18 – 21 Prime aileron brackets and fairings 10 Jan 18
- 7.8.17 Autopilot wiring loom 10 Jan 18
- 7.8.17 Finish autopilot wiring loom 12 Jan 18
- 7.8.1 Dismantled the wing stand 15 Jan 18
- 7.8.1 Build wing crate trolley 17 Jan 18
- 7.8.19 Countersink flap brace & pitot mast and move wings into trolley 18 Jan 18
- 7.8.2 Drill, debur & prep wing access plates 19 Jan 18
- 7.8.19 – 22 Prime flap brace & bottom skins 25 Jan 184.0
- 7.8.19 & 7.9.3 to 6 Rivet flap braces to wing and assemble ailerons 02 Feb 184.5
- 7.8.22-25 Rivet bottoms skins onto wing structure 10 Feb 186.5
- 7.8.22-25 Rivet pitot mast & access plate nutes & prime aileron c… 11 Feb 184.0
- 7.8.22-25 Torque tank attach bolts, JC5A inboard right wing joints & p… 12 Feb 181.0
- 7.8.22-24 Rivet right bottom inboard wing skin 17 Feb 182.5
- 7.8.24-25 Right wing outboard skin riveted 18 Feb 183.75
- 7.11.3 – 12.1 Rig left aileron and mount left flap 13 Apr 183.0
- 7.7.13 & 12.13 Fit right flap & left & right push rods &… 25 Apr 183.0
- 7.12.3 Attach left flap & adjust hinges 07 May 182.5
Fuel Tanks
- 7.7.23 Cut fuel tank access holes 02 Jan 172.0
- 7.7.24 – 26 Drill & debur access plates 06 Jan 172.0
- 7.7.22 Capacitive Fuel Sender Plates & BNCs 08 Jan 172.0
- 7.7.22 & 29 Debur Capacitive Sender & Tank Skins 10 Feb 176.75
- 7.7.26 Reinforcement ring countersink & prep 12 Feb 171.2
- 7.7.42 – 45 Fit right capacitive plates, pickup tube & prepare b… 29 Sep 173.0
- 7.7.46 Final checks of left & right tank before closing 30 Sep 172.25
- 7.7.46 Water test the right fuel tank 10 Oct 170.75
- 7.7.46 Water test results and leak found 11 Oct 170.5
- 7.7.46 Empty right tank and retest left tank 12 Oct 171.0
- 7.7.46 & 53 Tank leak found and z-brackets prepared 14 Oct 174.0
- 7.7.46 Inspector passes tanks and leading edges 18 Oct 173.0
- 7.7.46 Clean & check left fuel tank 28 Oct 171.0
- 7.7.47 – 54 Closing the left fuel tank 02 Nov 17
- 7.7.47 – 54 Closing the right tank and leak testing left fuel tank 04 Nov 17
- 7.7.58 Leak tested the right tank 08 Nov 171
- 7.7.54 Right tank passes test and left tank fixed 10 Nov 172.5
- 7.7.58 Another leak found and fixed in left fuel tank 16 Nov 171.0
- 7.7.58 Test & fix left tank (again) & prime right tank 17 Nov 174.0
- 7.7.58 Mega fix left fuel tank and prepare wing walk doublers 19 Nov 17
- 7.7.58 More left fuel tank work. 24 Nov 17
- 7.8.12 Fit right fuel tank to wing 25 Nov 17
- 7.7.58 Left fuel tank passes test and fuselage ordered 27 Nov 17
- 7.8.12 Fuel tanks finished 02 Dec 17
Leading Edges
- 7.8.2 Scuff & dimple left & right leading edge skins 01 Oct 173.0
- 7.8.2 Wash leading edge parts for priming 02 Oct 171.0
- 7.8.2 Priming the Leading Edges 03 Oct 172.5
- 7.8.10 Assembling the Leading Edges 07 Oct 175.10
- 7.8.3 & 10 Riveted right leading edge and cut skin for pitot mast 08 Oct 174.5
- 7.8.4, 5 & 11 Deburred and dimpled right wing structure and riveted le… 21 Oct 176.0
- 7.8.11 Rivet right leading edge skin 27 Oct 17
- 7.8.11 Rivet left leading edge to spar 10 Nov 171.5
- 7.8.11 Rivet right leading edge to main spar 17 Nov 172.0
Ailerons
- 7.8.18 Aileron brackets 09 Dec 174.25
- 7.11.3 Started large pushrods 20 Jan 181.75
- 7.9.1 & 7.11.3 Prepare Aileron Stiffeners and finish drilling large pu… 21 Jan 184.0
- 7.9.1 – 2 Drill stiffeners, debure and dimple 25 Jan 184.0
- 7.9.3 – 4 Make Aileron reinforcement plates & drill forward ribs… 26 Jan 184.0
- 7.11.3 Assemble push rods & meet with Inspector 26 Jan 184.0
- 7.9.2 Clean Aileron parts for priming 27 Jan 182.75
- 7.9.2 Prime aft Aileron parts 28 Jan 183.25
- 7.9.2 Scuff right forward aileron parts & rivet nutplates to both skin… 29 Jan 18
- 7.9.2 Rivet stiffeners and bend aileron skins 30 Jan 182.0
- 7.9.5 to 7 Match drill & debur ailerons 03 Feb 183.9
- 7.9.7 Dimple & countersink aileron parts 05 Feb 182.0
- 7.9.7 Wash aileron parts for priming and torque left wing fuel tank bolts 06 Feb 182.0
- 7.9.7 Wash prime aileron parts 08 Feb 182.5
- 7.9.7 Epoxy prime aileron parts and inspector signs off wings, ailerons … 09 Feb 183.0
- 7.9.3, 8 & 9 – Begin riveting left & right ailerons 13 Feb 182.5
- 7.9.9 & 10 Continue riveting left & right ailerons 16 Feb 184.0
- 7.9.9 + 10 Finish riveting right aileron 17 Feb 181.0
- 7.11.3 Rig right aileron 14 Apr 180.5
Flaps
- 7.10.1 – 3 Start building the flaps 19 Feb 182.0
- 7.10.9 – 12 Rivet flaps 09 Apr 189.0
- 7.12.3 Make flap mounting pins & left locking mechanism 15 Apr 185.0
- 7.12.13 Prime flap hinges 16 Apr 181.75
Fuselage
Firewall
- 8.4.1 to 8 Match drill firewall 28 Apr 185.0
- 8.4.7 – 9 Fabricate doublers for firewall 29 Apr 181.75
- 8.4.10 Debur, scuff & countersink parts 30 Apr 182.25
- 8.4.10 Countersink firewall parts & prep for priming 07 May 183.0
- 8.4.10 Prime all firewall parts 09 May 183.5
- 8.4.11 Dimple firewall and rivet parts on 12 May 184.0
Bulkheads
- 8.5.1-5 Begin F-704 bulkhead 12 May 184.0
- 8.5.7-9 F-704 Fit nutplates & prep cover support ribs 23 May 183.0
- 8.5.11-14 F-704 Spacers 24 May 183.0
- 8.6.1-2 F-705 lower section 27 May 184.0
- 8.6.4 F-705 Fabricate F-705G brackets and countersink doublers 28 May 181.5
- 8.6.2 & 3 F-705 Drill seat belt attach points and fabricate brackets 28 May 18
- 8.6.5-7 F-705 Fabricate more parts & assemble upper spar 03 Jun 185.5
- 8.6.8 + 10 Drill flap bearing and debur F-705 parts 04 Jun 182.0
- 8.5.14 & 8.16.9 Prep & prime F-704 & F-709 parts 10 Jun 187.5
- 8.6.9 Rivet F-705 Bulkheads together 15 Jun 183.0
- 8.5.9 Rivet F-704 together 16 Jun 185.0
- 8.7.1-9 Drill, debur and prep F-706 bulkhead parts 24 Jun 186.0
- 8.8.1 Drill & Debur F-708, F-709 & F-710 bulkheads 30 Jun 183.0
- 8.9.1 & 2 Match drill & debur F-711 Bulkhead 01 Jul 184.0
- 8.9.2 + 8.10.1 Scuff & wash parts for priming 02 Jul 186.5
- 8.10.1 Prime all bulkhead parts 03 Jul 184.0
- 8.9 & 8.10 Rivet F-709, F-711 & F-712 bulkheads 08 Jul 181.5
- 8.10 Rivet F-706, F-707 & F-708 bulkheads 09 Jul 183.0
Aft Fuselage
- 8.12.1-5 Trim skin and fit tail spring mount 22 Jul 184.25
- 8.12.12-13 Drill top J Stiffeners 25 Jul 182.25
- 8.12.5-11 Assemble aft fuselage 25 Jul 184.0
- 8.12.13 Drill bottom J Stiffeners 28 Jul 183.0
- 8.12.13-15 Drill skins to ribs 28 Jul 185.0
- Primed lots and lots and lots of parts 12 Jul 203:45
- Riveted aft deck and parts to fuselage 19 Jul 204:35
- Rivet bulkhead to aft deck & fit rudder cables 22 Jul 201:40
- Fitted static pipework 06 Dec 201:30
- Riveted aft aft skin, fitted seat belt anchors, started ADAHRS bracket and … 12 Dec 2010:15
Longerons
- 8.11.1-2 Measure & mark longerons 04 Jul 181.0
- 8.11.1-4 Cut & mark longerons 09 Jul 182.75
- 8.11.5-10 Bending Longerons 14 Jul 184.5
- 8.11.11-14 Drill aft canopy deck and cut J-Stiffeners 15 Jul 183.0
- 8.11.14 – Trim aft end of J-Stiffeners 19 Jul 182.0
- 8.15.1 – 4 – Notch longerons and fit to aft fuselage 10 Feb 194.0
Center Fuselage
- Crotch Brackets & Seat Ribs 13 Feb 195:30
- Continued riveting fuselage centre section 24 Feb 198.5
- Working on seats 03 Mar 199.75
- Bend fuselage skins & drill longerons 10 Mar 197.5
- Worked on Baggage blukhead panel and tie down ring storage 19 Dec 2013:15
- Prepped the baggage panels for paint 27 Dec 203.0
- Made brackets to support wiring conduit and drilled bulkheads 03 Jan 213:15
- Washed, primed & painted baggage parts and fitted conduit brackets 25 Apr 2111:30
- Started aft seat floors, forward tunnel cover & flap covers 02 May 2116.5
- More flap cover work & started seat backs 09 May 2112.5
Forward Fuselage
- Fitted firewall to fuselage 17 Mar 192.0
- Drill Firewall to Skins, make attach straps and start auxiliary longerons 24 Mar 193.5
- Auxiliary Longerons 13 Apr 195.0
- Fit lower longerons 28 Apr 195.5
- F-902 Bulkheads 05 May 195.0
- Made another gusset 13 May 192.5
- Fitted tank brackets, spacers and started rudder pedals 26 May 195.5
- Rudder pedals 29 May 194.0
- First fit rudder pedals and brake master cylinders 09 Jun 194.5
- More rudder pedal work, drill floor stiffeners and begin baggage area 25 Aug 1912.5
- ‘Laundry list’ of tasks and compressor fixed! 29 Aug 198.0
- More match drilling 28 Sep 193.5
- Match drill main skins & begin disassembling 10 Oct 196.5
- More disassembly and a quick drilling 29 Dec 192.0
- Still disassembling! 02 Feb 205.5
- More washing up and started painting 26 Apr 2017.0
- Reassemble fuselage ready for riveting 03 May 2020.25
- More fuselage riveting and continued building replacement flap 17 May 209.5
- More riveting and flap work 24 May 2011.75
- More riveting of the forward fuselage 28 May 206.35
- Flipped the canoe and levelled the fuselage 06 Jun 2012.75
- More work on the forward fuselage 13 Jun 2018.75
- Make another rudder fairing and wash some parts 28 Jun 206.1