The next task on the longerons is drilling the aft canopy deck to the longerons. This involved placing the deck on the 28 1/4 mark and making sure the longeron bend matched the curve of the deck. It did so I clamped it in place with lots of clamps then drilled it in place.

Once both longerons were drilled to their decks I then had to find a place to store them for a while. I chose to rest them above the wings where they are out of the way and safe.

Lastly for today, I found the J Stiffeners and cut them to the 3 different lengths on the plans.

That’s all for today.