7.7.46 Inspector passes tanks and leading edges

Before work this morning I checked the right tank for leaks, particularly the BNC connector. Great news, no leaks so I drained the tank of all water and left it to dry for the impending inspectors visit.

I also gave the workshop a thorough clean! I can’t believe how grubby it had gotten.

Later in the afternoon my inspector arrived and inspected both fuel tanks and leading edge assemblies. He gave me a few great tips and was happy for me to carry on to the next stage. Yay!

After that I JC5A’d and fitted the left leading edge to the main wing spar ready for riveting.


I ran out of time today to actually rivet the leading edge so I will do that another day. That’s enough for today.

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright G-RVAA Official Site 2018
Shale theme by Siteturner
%d bloggers like this: